Projects

Overview
A project bundles everything belonging to an engagement: tasks, milestones, dates, budget, team, files and communication. The list shows project, customer, status, health, risks, type, budget and due date.
Health is the figure that matters day to day. It summarises whether a project is in order — and is therefore the only thing readable across thirty projects at once. Filtering and grouping is by status, type, health and customer.
Core tasks
Create a project. New project asks for name, customer, type, billing mode, budget in hours and amount, start, due date and notes. Optionally you choose a template — the dialog then shows a preview of its milestones, lists and tasks, and after creation milestones, tasks and budget come with it; all due dates are calculated relative to the project start. The structure is built in the background: the project opens at once with the notice Project is being created from the template and fills itself. If creation fails, the project says so and offers Try again — see project templates.
Start from a quote. Project from quote takes an accepted quote: fixed-price lines become billable milestones, effort and quantity lines flow into the hours budget. The project is created as a draft — you check it before it runs.
Run the project. The detail page is organised into tabs:
| Tab | Content |
|---|---|
| Overview | master data, budget, visibility, autopilot |
| Tasks · Milestones · Boards · Project plan | the work itself |
| Team | project members |
| Risks & issues | with severity, owner and mitigation |
| Profitability | what the engagement brings in |
| Files · Communication · Work-item activity | everything attached |
Earned margin in the Profitability tab. The project shows target budget, costs, earned revenue and earned margin. Earned means: the value of billable time, milestones and the fixed price — even if no invoice has been written for it yet; time and external costs are deducted. The invoiced margin from the invoices is in Reporting in the profitability cockpit (Reports); the notice in the tab leads there directly with Invoiced margin (permission reporting.kpi.financial). If the two differ, work is usually earned but not invoiced yet — or invoiced in advance.
Set milestones. A milestone carries name, colour, due date, status, order and — the commercial part — billable, a tranche as an amount, and acceptance required. Where acceptance is required, it is released through Accept. If the customer accepts in the portal a billable milestone with a tranche, the built-in automation Acceptance in the portal: milestone billing as draft triggers the billing itself — the tranche then sits as a draft in the billing preview, nothing is sent. Switch it off or limit it to individual brands under Automations (brand of the automation or a condition on the brand).
Customer uploads. If a customer uploads a file to a project in the portal, the project lead gets a notice with a jump to the Files tab (automation Customer upload on a project: notify project lead, active by default).
Plan and actual per milestone. Give a milestone planned hours and planned cost, and the Milestones tab shows under each entry what has actually been spent: "Hours 12.5 of 40" and "Cost €1,250 of €4,000", with a bar that turns amber from 80 % and red from 100 %. Actuals come from the time entries on the tasks assigned to the milestone — at the cost rate that applied when they were booked. Without a plan, only the actual is shown. Only users with budget view (projects.budget.view) see and maintain the plan, only users with projects.profit.view see the actuals — the same rights as on the project itself.
Different internal rate per member. In the Team tab you can pick an internal rate per member — one of the rates from your price lists. For new time entries of this person in this project it replaces their cost rate; the project's cost, margin and budget health are calculated with it. Time already booked keeps the rate that applied at booking. Tip: create a separate, inactive price list for internal rates (e.g. "Internal costing rates") — inactive lists do not feed into sales prices. Only users who may manage the project team (projects.member.manage) can change the rate; only users with projects.profit.view see the amount.
A freelancer's cost path. If a member is a freelancer, the team dialog chooses their cost path in this project: path B — supplier invoice is the default (the freelancer invoices their work as an independent contractor), path A — time tracking is a deliberate exception and requires a reason. The team row shows Path A or Path B. The path decides what counts towards the margin when costs overlap: if the freelancer books time and their linked supplier has orders or incoming invoices in the same project, only the chosen path counts — the order for path B, the time for path A. This prevents double costs. For every overlap the Team tab shows a notice naming the freelancer and the path that counts. By default Octibiz warns when the time is booked and when the order or invoice is recorded; the project settings can switch this to block. Only users who may manage the project team (projects.member.manage) can change the path.
Template newer than the project. A project created from a template remembers which version of the template it came from. If someone later changes the template's milestones, lists or tasks, the project shows the notice Template newer than this project at the top, including the difference (new, removed, changed). Nothing changes by itself: Adopt new items only creates what was added, Dismiss notice marks the version as seen.
Critical path and baselines in the project plan. The Project plan tab computes the critical path from dates and dependencies: the chain of tasks where every day of delay moves the project end. Critical bars and the arrows between them appear red; the Critical path switch hides the highlighting. Counting is in working days of the project's brand — Mon–Fri without the full-day holidays of the brand's country and holiday region (as for the delivery date). A chain from Friday to Monday has no gap, nor does one from Thursday to Monday when the Friday is a holiday. Moving a task with float changes nothing; moving a critical one moves the project end with it. Save baseline freezes the current dates of all tasks and milestones. From then on the plan shows each bar's position in the baseline as a thin grey line underneath, and at the top by how many days the project end has moved against the baseline. Under Compare with you pick an older baseline or No comparison. Saving and discarding requires the right to edit the project (projects.project.edit); anyone who can read the project sees the comparison.
Status and acceptance as PDF. Status PDF in the project header creates a status report with the brand letterhead: key data, progress (completed tasks), milestones, open risks and acceptances. Budget and actual cost only appear if you may see them on the project. In the Milestones tab every acceptance has a PDF icon: the acceptance record names subject, type, decision, who decided when, IP address, comment or change request and — for an acceptance in the customer portal — the signer with the checksum of the consent.
Offer a change order. When the customer wants changes or extra work arises, Offer change order (Milestones tab, Change orders card) creates a quote linked to the project: customer, brand and subject come from the project, your description becomes the introduction. If the customer returned an acceptance with a change request, Offer change order sits right on that acceptance — the change request is taken over. The quote opens as a draft; you maintain lines and prices there. While a change-order draft is open, another click opens it instead of creating a second one. The quote shows Change order for project with a link back, and the Change orders card on the project lists all of them. This needs the quotes module and finance.quote.create in the project's brand.
Bill by completion. Fixed-price projects can be billed in percentage steps instead of by milestones: billing mode By completion, the budget amount is the fixed price. On the Milestones tab the card Billing by completion shows how much has been billed. Enter the reached state under Bill up to (%) — say 60 % — and click Bill: exactly the difference to the previous state is billed (with 30 % before, another 30 % of the fixed price); the card shows the amount in advance. The step lands in billing as a one-off item and becomes an invoice from there. The state only goes up; 100 % bills the remainder to the cent. This needs projects.billing.trigger in the project's brand; the amount is visible to whoever may see the budget.
Record meetings and decisions. On the Communication tab, next to Internal note and Message to customer, there are the entry types Meeting and Decision — with a title ("Weekly sync 12 Mar", "Colour concept B approved") and text. They are internal and appear in the history with their own badge. The filter Meetings or Decisions shows the project log without the rest of the communication in between. Via the API, filter with GET /api/v1/communications?subjectType=project&subjectId=<ULID>&type=meeting,decision.
Request files and feedback from the customer. The Files tab holds the card Request from the customer. Request files asks what is needed, a note, a deadline and the file slots (one line per file, e.g. "Logo as SVG"). The customer is notified in the customer portal and by email, sees the request in the project and uploads per slot; the files land in the project folder. Once every slot is filled, the request is Submitted; Done closes it, Reopen brings it back. Start feedback round creates a feedback round with a subject ("Home page draft v2"): the customer approves in the portal or asks for changes — like an acceptance, but without any effect on milestones or billing. One round per subject is open at a time; after the decision the next one can start. Requesting needs projects.project.edit; the project needs a customer.
Govern visibility. A project can be private — then only you and the project members see it. Additionally external contributors can be set: externals then see only the work items assigned to them.
Duplicate and turn into a template. Duplicate creates a new project with the same structure; completed tasks, sign-offs and billing markers stay with the original. A new project start shifts every date by the same difference. As template creates a project template and converts absolute dates into offsets from the project start.
Switch on the autopilot. A daily scan reports conspicuous states to the project team — planning needed, schedule deviation, budget early warning and inactivity, either schedule-oriented or agile. The autopilot only notifies. It never changes status, dates or budgets — which is why it can be switched on without worry.
High share of one freelancer. An additional alarm reports when a single freelancer accounts for a large part of the tracked project time. That is the main indicator of de-facto integration (bogus self-employment) — and nobody notices as long as nobody looks at the distribution. It goes to the project lead only, from 20 tracked hours and from the configured threshold (provisionally 70 %). The alarm is off by default: the final threshold belongs before the review with the tax adviser and the social security office. Anyone working along path B (the freelancer issues an incoming invoice and therefore tracks no time in the system) never shows up here — which is exactly the distinction that matters.
Fields in detail
The What it does column answers what changes in the system — not what the field is called. The grey name behind the label is the API field: the same thing runs under that name through automation, import and AI tools.
Creating and editing a project
| Field | Required | Values / format | What it does |
|---|---|---|---|
Name name | yes | text, max. 255 characters | The only required entry. Appears in list, time recording, reporting and on the service record. |
Customer customerUlid | no | an existing customer | Who the work is for. Only then does the project show up in the customer record and become billable. |
Type type | no | master data "project types" | The kind of project. It brings the billing mode and the default for billable along. |
Status statusKey | no | master data "project statuses" | Where the project stands. The category behind it decides whether it counts as running — not the name. |
Start startsAt / End dueAt | no | date | The planned period. The basis for planning, utilisation and the question of what is running right now. |
Brand brandId | no | one of your brands | Which brand the project runs under. |
Contract contractId | no | an existing contract | Links the project to a contract — work then draws on its quota instead of producing its own invoice. |
Billing mode billingMode | no | by milestone, by time, against quota, by completion | How money arises. By time bills recorded hours, by milestone fixed amounts on acceptance, against quota draws down a paid allowance, by completion bills the fixed price (budget amount) in percentage steps. The choice determines which of the fields below have any effect. |
Billable by default defaultBillable | no | yes/no | What new time entries in this project are pre-filled with. A default only — it stays changeable on the entry. |
Budget (hours) budgetHours | no | 0 or more | The planned effort. Recorded time is set against it; the system reports an overrun instead of leaving it to surface in the post-calculation. |
Budget (amount) budgetAmount | no | amount | The same in money. |
Visibility visibility | no | normal or private | Private shows the project to its members only. |
Team teamId | no | an existing team | Which team is responsible for the project. Next to the brand a second visibility level: roles with the "own team only" option see only their teams' projects. Without a team the project is visible to everyone; moving it requires the manage permission in the target team. |
Externals see assigned only externalAssignedOnly | no | yes/no | Set to yes, external participants see only the tasks assigned to them — not the whole project. The switch that governs working with freelancers. |
Notes notes | no | multi-line text | Free text on the project. |
Tasks by email
| Field | Values / format | What it does |
|---|---|---|
Task address taskMailToken | text, max. 40 characters | The secret part of a mail address written to in order to create a task in the project. Anyone who knows the token can create tasks — so treat it like a password and regenerate it on suspicion. |
Target list taskMailListId | a list of the project | Which list the tasks created this way land in. |
Milestones
| Field | Required | Values / format | What it does |
|---|---|---|---|
Name name | yes | text, max. 255 characters | What the milestone is called. It appears on acceptance and invoice. |
Project projectId | yes | an existing project | Which project it belongs to. |
Due at dueAt | no | date | When it should be reached. |
Status statusKey | no | master data "milestone statuses" | Where it stands; the category behind it decides on "done". |
Billable billable | no | yes/no | Whether money is attached to the milestone. |
Amount billingAmount | no | amount, 0 or more | What is billed on reaching it — with milestone billing, the load-bearing figure. |
Acceptance required acceptanceRequired | no | yes/no | Set to yes, the invoice arises only after the customer's acceptance, not on ticking the box. The difference between "we are done" and "the customer says we are done". |
Colour color | no | colour value, max. 20 characters | Colour on the timeline and the board. |
Order sortOrder | no | 0 or more | Position in the sequence. |
Planned hours budgetHours | no | whole hours, 0 or more | What the milestone's actual hours are compared against. Maintained and visible with budget view only. |
Planned cost budgetAmount | no | amount, 0 or more | What the milestone's actual cost (time × cost rate at booking) is compared against. Maintained and visible with budget view only. |
Members
| Field | Required | Values / format | What it does |
|---|---|---|---|
Employee employeeId | yes | an employee | Who works on the project. On private projects membership decides visibility. |
Role projectRole | no | lead, member, reviewer, observer | What the person does on the project. Observer follows along, reviewer accepts. |
Planned hours allocationHint | no | number | What utilisation planning calculates with. |
Internal rate internalRateId | no | a rate from a price list | Which internal hourly rate this person's work on this project is costed at — it replaces the employee's cost rate for new time entries and so feeds cost, margin and budget health. Changing it requires projects.member.manage. |
Cost path costPath | no | path B — supplier invoice (default), path A — time tracking | Freelancers only. Which costs count towards the margin when time and supplier orders overlap. Changing it requires projects.member.manage. |
Reason costPathNote | for path A | text | Why the freelancer is exceptionally costed through time tracking. |
Baselines and change orders
| Field | Required | Values / format | What it does |
|---|---|---|---|
Project projectUlid | yes | project | Which project plan the baseline belongs to. Set from the project page. |
Name name | no | text, up to 120 characters | Name of the baseline in the Compare with list; empty = "Baseline" with the date. |
Acceptance acceptanceUlid | no | acceptance with a change request | Change order from this acceptance: its change request becomes the quote's introduction. |
Change request note | no | text | Introduction of the quote when the change order does not come from an acceptance. |
Subject title | no | text | Subject of the quote; empty = "Change order: <project>". |
Interface and automation only
| Field | Values / format | What it does |
|---|---|---|
quoteId, quoteUlid, include, targetName, templateUlid | quote, scope, target name, template | Creates a project from an accepted quote or from a project template. include determines what is carried over (items, milestones, tasks). |
quoteItemRef (on the milestone) | reference to a quote item | Binds the milestone to the item it came from. |
templateSyncMode | adopt, dismiss, retry | Template follow-up action on the project: adopt creates what was added in the newer template version, dismiss hides the notice, retry restarts a failed creation from the template. |
externalRefs | label-to-value mapping | Origin in a foreign system. A second import recognises the project by it. |
Settings & permissions
- Module
module.projects, fail-closed. projects.project.viewto see,projects.project.createto create,
projects.project.create_from_quote for the route via a quote, projects.project.edit and projects.project.delete to change and delete.
projects.member.managefor the team,projects.task.managefor the tasks,
projects.acceptance.internal for internal sign-offs, projects.billing.trigger for billing and projects.profit.view for profitability — the last deliberately separate, because margins are not everybody's business.
- Saving and discarding baselines requires
projects.project.edit, the PDFs
projects.project.view, a change order additionally finance.quote.create in the project's brand (and the quotes module).
- Project statuses, milestone statuses and project types live in
Project settings. Task statuses and priorities are core master data and live under Task settings.
FAQ & troubleshooting
Health is red but I see no reason. Look at Risks & issues and at the milestone dates. The autopilot reports the same anomalies when it is active.
A milestone cannot be billed. Check whether it is marked billable and whether a required acceptance is still outstanding.
I cannot see profitability. That requires projects.profit.view.
Offer change order reports "no customer". A change order is a quote and needs a recipient — set the customer on the project.
Almost everything is critical in the project plan. Critical means no float until the project end. If tasks follow each other without gaps, that is correct; float comes from parallel work or earlier dates.
The project from a template stays empty and says "being created". The structure is built in the background; that usually takes a few seconds. If the notice stays, the installation's background worker is not running — operations has to start it.
An internal rate does not affect old time entries. By design: every time entry freezes its cost rate at booking. The member's rate applies to everything booked — or re-valued on correction — afterwards.
Completed tasks are missing after duplicating. By design — completed tasks, sign-offs and billing markers stay with the original. What is copied is the structure, not the past.