Octibiz
Demo

Durchsucht Website und Dokumentation gemeinsam. Enter zeigt alle Treffer, Esc schließt.

Project templates

Project templates screen in Octibiz

Overview

A project template is a ready-made shape for a whole project: milestones, tasks and an hours budget that come along when it is created.

The trick lies in the dates: due dates are stored relative to the project start, not as fixed dates. A template therefore does not go stale — it is calculated against the actual start on creation.

Boundary against task bundles: a template creates a new project; a bundle is loaded into an existing one.

Core tasks

Create a template. New template requires a name; project type, description, hours budget and brand are optional. The list shows template, type, brand, content — as a count of milestones and tasks — budget and active state.

Choose a brand or leave it open. Left empty, the template applies to every brand. That is usually right; a brand-bound template only pays off when the shape genuinely differs.

Add milestones and tasks. Both are maintained with due dates relative to the project start.

Create one from a running project. Instead of building a template from scratch, a proven project can be converted through As template — absolute dates are automatically turned into offsets from the project start. This is usually the faster and more honest route, because the template then reflects how the work was actually done.

Fields in detail

The What it does column answers what changes in the system — not what the field is called. The grey name behind the label is the API field: the same thing runs under that name through automation, import and AI tools.

Project template

FieldRequiredValues / formatWhat it does
Name nameyestext, max. 255 charactersThe name the template is offered under when creating a project.
Description descriptionnotextWhat the template is for. Helps a colleague pick the right one.
Project type projectTypenomaster data "project types"Which type the created project gets — and with it its billing mode.
Default budget (hours) defaultBudgetHoursno0 or moreWhat the created project's budget is pre-filled with.
Milestones milestonesnolist of milestonesThe milestones created along with it — with name, order and amount. Due dates are calculated relative to the project start, not copied as fixed dates.
Task lists listsnolist of task listsThe task lists of the created project — with name, colour and order. The template's tasks are filed by their position in this list; without task lists every task lands in the project's default list.
Tasks tasksnolist of tasksThe tasks created along with it — with title, list, priority and estimate.
Brand brandIdnoone of your brandsLimits the template to one brand.
Active activenoyes/noOff means no longer selectable. Projects already created are untouched — a template is a stamp, not a link.

Settings & permissions

  • Module module.projects.
  • Permission projects.config.manage.
  • The template's project type determines the billing defaults of the resulting project, see

Project settings.

  • Deactivate rather than delete when a template is phased out — projects already created are

untouched.

FAQ & troubleshooting

The dates in the new project are wrong. They are calculated from the project start you entered. Without a start date there is no reference point.

The template does not appear when creating a project. Check the active state and the brand: a brand-bound template appears only there.

I want to add tasks to a running project. Templates are the wrong tool for that — use a task bundle.

The template no longer reflects how we work. Convert a current, well-run project through As template rather than patching up the old template.

projects.templates · Available from version 0.5.0